How we work
From brief to live.
No surprises at the end. You know up front what happens, what we hand over, and what we need from you at each step.
Timeline
A standard website goes live within two weeks.
With complex automation or integrations, expect three to four weeks.
-
Intake
We start with the question behind the question: what has to change, for whom, and how will you know it worked. Scope and project type are fixed here, not halfway through.
-
Direction
We gather references — yours and ours — and turn them into one chosen direction, so taste stops being a matter of opinion and becomes a decision.
-
Brand
The direction becomes a real identity: voice, colour, typography. Colours are checked against WCAG contrast requirements here, not repaired later.
-
Structure
Which pages exist, how they relate, and what lives in the navigation. Structure follows how your visitor thinks, not how your company is organised.
-
Content
Every page gets its text written against the voice rules, with search and AI findability built in per page rather than bolted on at the end.
-
Design
The visual design per page and per component, including motion. Accessibility and loading speed are requirements here, not a wish list.
-
Build
The design becomes production code. We test against Core Web Vitals and accessibility while building, so nothing has to be unpicked afterwards.
-
Integrations
Your site connects to what you already use: CRM, accounting, mail, payments, booking. This is where automation replaces the work you were doing by hand.
-
Live
We take the site live, set up measurement, and check that search engines and AI systems can actually read it.
And after launch?
A launch is a starting point, not a finish line. Marketing, content and growth are a separate track you can take or leave — we would rather you spend that budget when it makes sense than bundle it in by default.